Technical +44 (0) 191 587 9213 | General Enquiries +44 (0) 191 587 2287

St Vincent Plaza, Glasgow

Main Contractor: Bowmer & Kirkland Architect: Keppie Design System: Optima TFC Installer: Keyclad Finish:  Polyester powder coated, RAL 9006 & 9007 & Rimex Stainless Steel Rosy Gold Location: Glasgow   Sotech were engaged by Keyclad to produce…

Aker Solutions, AIBP, Aberdeen

Main Contractor: Bowmer & Kirkland Architect: Keppie Design System: Bespoke Glazed in Traypanels Installer: Charles Henshaw Finish:  Licht Bronce FF2 Location: Aberdeen   Sotech were engaged by Charles Henshaw to produce 2200 square meters of bespoke…

National Hockey Centre

Installer: Procladd System: Fascias and Bullnoses Finish: 2mm Mill Finish Location: Glasgow   The Glasgow National Hockey Centre was constructed for the Commonwealth Games in 2014 and includes two synthetic hockey pitches, player facilities and a permanent…

Close
Download List (0)

No downloads in list yet. No downloads in list yet.

Close
0