2500m2 Optima TFC in 4mm Alucobond A2 ACM Silver Metallic 500 has been used in the completion of Project Medius in Leicester. Part of a wider £50m project on the site of the former…
2400m2 of Optima TFC in 2mm Aluminium Axalta PPC has been used in the completion of the striking Nottingham College City Hub, in addition to 800lm of Feature Fin Pressings & 200m2 of Optima XPC…
1,500 sqm of perforated and solid bespoke 3mm aluminium panels in Sotech’s Optima TFC system have been used in the completion of the £30m Frederick Douglass Centre for Newcastle University. Completed in 2019 as part…
11,500/m2 3mm Aluminium 1050 Grade H14 in Optima FC & Optima TFC Systems has been used in the completion of the striking Onyx building, Lancaster Circus in Birmingham. Optima FC was selected as the client…
3900m2 Optima TFC in PPC Aluminium & 1800m2 Optima FC in Axalta PPC Aluminium have been used in the completion of the 400+ room in Salford’s latest student accommodation project. The Optima TFC system was proposed to create a ‘basket weave’ pattern to the façade…
5500/m2 of Optima TFC in solid Aluminium PPC and around 1000m2 of 2.0mm Aluminium 1050 Grade & 3.0mm Aluminium 1050 Grade have been used in the construction of Sheffield’s New Era Square, a £66 million…
3,500/m2 of Aluminium J57S Grade Anodised in UNITED ANODISERS Regency Gold 3 has been used in Glasgow’s Queen Street Station; a station expected to see a 40% increase in users by 2030. The Optima Through…
Optima TFC & Specialist Pressings in 3.0mm Aluminium J57S Grade, Anodised in united anodisers Anolok 541 were selected for the new Oman air traffic control centre in Oman. Optima TFC, Sotech’s through fixed cassette rainscreen…
4500m2 of Optima FC, TFC, IPC & Feature Fabrications in Aluminium Axalta PPC has been used in the completion of Horizon Heights student accommodation at Liverpool Lime Street. Positioned by Liverpool Lime Street train station,…
6500m2 of Optima TFC in 2.0mm Reynolux Pre-Coat & 2.0mm Aluminium Axalta PPC has been used in the completion of the £36 million student accommodation on Norton Street, Liverpool. The Reynolux Pre-Coat was chosen due…
6000sqm of Optima TFC in PPC Ral: Saphire has been used in the brand new Hilton Garden Inn, London Heathrow T2 Hotel. Project Details: Project: Hilton Garden Inn, London Heathrow T2 Hotel System: Optima TFC Finish:…
700 sqm of Optima TFC in 3.0 mm Aluminium J57S UNITED ANODISERS Regency Gold 1 has been used on the brand new Northshore Hilton hotel in Stockton in the North East. Optima TFC was selected…
5,500m2 of a specially designed rainscreen cladding system – a hybrid of Sotech Optima’s FC & TFC systems - has been used in the £450m regeneration of Slough town centre. The hybrid system, which was…
Over 1200/m2 of Alucobond Silver Metallic 500 and 900/m2 of Aluminium Anodised in united anodisers Regency Gold 1 have been used in the completion of White Rose Shopping Centre in Leeds. With its unique flatness,…
We are delighted to bring you a range of photos showing the use of Optima TFC - 2mm Aluminium J57S `UP` IN UNITED ANODISERS Regency Gold 1, complete with feature fin pressings at random panel…
Location: Newcastle Upon Tyne Installer: Dane Architectural Systems Main Contractor: George Downing Architect: Simpson Haugh Architects System: Optima TFC & Flashings Material & Finish: 3mm PPC RAL 9006 & 9007 The what3words address to help you find this…
Approximately 400m2 of Optima TFC was selected for the refurbishment of the Vue Cinema in Walton-le-Dale, Preston. Finished in PPC (in various Axalta colours), the modernisation of the building consists of a large new façade,…