Technical +44 (0) 191 587 9213 | General Enquiries +44 (0) 191 587 2287
The Springs Thorpe Park Leads Cover

Thorpe Park, Leeds

The Springs, Thorpe Park, Leeds

We are delighted to bring you a range of photos showing the use of Optima TFC – 2mm Aluminium J57S `UP` Anodised Regency Gold 1, complete with feature fin pressings at random panel joints and Optima TFC, Feature Pressings & Column Casings- 1.5mm Stainless Steel 316G Mirror Polished.

12454-Thorpe-Park-CGI010

Image above courtesy of The Harris Partnership

The Springs Thorpe Park Leads 7

The development includes a ten-screen Odeon cinema designed by The Harris Partnership, a 300,000 sq ft shopping and leisure park, as well as extensive parkland and sports facilities.

The Springs Thorpe Park Leads 7

Location: Leeds

Installer: Roofdec

Main Contractor:GMI

Architect: Harris Partnership

SystemOptima TFC (with Feature Fin Pressings & Column Casings)

Material & Finish2mm Aluminium J57S `UP`Anodised Regency Gold 1 & 1.5mm Stainless Steel 316G Mirror Polished

Close
Download List (0)

No downloads in list yet. No downloads in list yet.

Close
0