Travelodge, Abbey Wood
890m2 of 3.0mm Aluminium in Optima TFC+ and 2.0mm Aluminium in Optima IPC was used in the completion of the bold and brand new Travelodge in Abbey Wood Retail Park. Optima TFC+ is Sotech’s economical,…
890m2 of 3.0mm Aluminium in Optima TFC+ and 2.0mm Aluminium in Optima IPC was used in the completion of the bold and brand new Travelodge in Abbey Wood Retail Park. Optima TFC+ is Sotech’s economical,…
Over 9,500m2 of the brand new Optima FC+ Anodised Aluminium has been used in the ambitious completion of Kelaty House, a towering student accommodation and hotel in Wembley London. With three different surface finishes…
Work is now complete on the Glasgow Centre Premier Inn super tower! At 18 floors high and visible from much of Glasgow’s city centre shopping spots, the 249-bedroom hotel is perfectly located for visitors to…
6000sqm of Optima TFC in PPC Ral: Saphire has been used in the brand new Hilton Garden Inn, London Heathrow T2 Hotel. Project Details: Project: Hilton Garden Inn, London Heathrow T2 Hotel System: Optima TFC Finish:…
700 sqm of Optima TFC in 3.0 mm Aluminium J57S UNITED ANODISERS Regency Gold 1 has been used on the brand new Northshore Hilton hotel in Stockton in the North East. Optima TFC was selected…
1000sqm Optima FC was provided for London’s Heathrow Holiday Inn Hotel, the FC Rainscreen was the perfect choice as the client required secret fix large format panels for the 623-bedroom hotel. The panels were manufactured…
Location: Milton Keynes Installer: Metclad Contracts Main Contractor: Bowmer & Kirkland Architect: Marchini Curran Associates System: Optima FC Material & Finish: 1300sqm 2mm Corten Steel
Location: Aldershot Installer: FK Group Main Contractor: McLaren Construction Installer: FK Group Architect: Mountford Pigott System: Optima FC Secret Fix Rainscreen Material/Finish: Bronze Anodised Aluminium
Installer: Norking Aluminium Main Contractor: GMI Construction System: Optima TFC Location: Bradford
Travelodge has opened for business in Hull’s busy city centre, part of its rollout of similar facilities nationwide, and provides a welcome boost to the city’s bed spaces! Following numerous meetings with Architects Harris Partnership…
Architect: WCEC Architects Main Contractor: GMI Construction Installer: Norking Aluminium System: Optima TFC Through Fix Cassette Rainscreen Material / Finish: Copper Location: Sheffield
Sotech were engaged by Keyclad to produce approximately 2000sqm of rainscreen cladding, finished in PPC Ral: 7048, 7022, 7039, 1018, 9005 for the landmark Pullman Hotel on Liverpool’s waterfront. The integrated 216 room four-star hotel…
Sotech were engaged by Keyclad to produce approximately 2000sqm of rainscreen cladding, finished in PPC Ral: 7048, 7022, 7039, 1018, 9005 for the landmark Pullman Hotel on Liverpool’s waterfront. The integrated 216 room four-star hotel…