Technical +44 (0) 191 587 9213 | General Enquiries +44 (0) 191 587 2287
Northshore – Hilton Stockton

700 sqm of Optima TFC in 3.0 mm Aluminium J57S Anodised Regency Gold 1 has been used on the brand new Northshore Hilton hotel in Stockton in the North East.

Northshore – Hilton Stockton

Optima TFC was selected as the client required a discrete fixing system with a durable finish due to the building location.

Northshore – Hilton Stockton

The seven-story hotel development, Teesside’s first new Hampton by Hilton hotel, will complement the nearby Globe Theatre which is currently being restored by the Council back to its former glory as a major concert venue in the North East. 

Northshore – Hilton Stockton

“The Anodised façade provides a hard wearing aesthetically pleasing appearance. It is one of the more consistent in shade Anodising jobs I have seen.”  Jamie Smith, Estimator at Sotech Optima

PROJECT DETAILS

 

Project name: Northshore – Hilton Stockton

Location: Stockton

Sector: Hotels

Installer: Midas Cladding

Main Contractor: Bowmer & Kirkland   

Architect: Ryder Architects

 

SPEAK TO AN EXPERT

 

If you require advice with design detail, assistance with a specification or to discuss your project in detail contact our technical department who have over 35 years’ experience in the construction industry. The team is on hand to provide knowledge and support at every stage of your project.

Contact us >> 

Close
Download List (0)

No downloads in list yet. No downloads in list yet.

Close
0