Technical +44 (0) 191 587 9213 | General Enquiries +44 (0) 191 587 2287
Discovery Quay Phase 1 and 2

We’re delighted to share the completed Discovery Quay phase 2 in Salford, Manchester.

Discovery Quay Phase 1 and 2 Discovery Quay Phase 1 and 2

Sotech were originally specified to provide Optima TFC in PPC Aluminium and Optima FC in Axalta PPC Aluminium in the bold yellow for phase 1. In phase 2, Sotech provided the same systems and materials in the colourful blue shades.

Discovery Quay Phase 1

Discovery Quay Phase 2

Discovery Quay Phase 1 and 2

The Optima TFC system was used to create the distinctive ‘basket weave’ pattern to the façade, which includes a mixture of both landscape and portrait orientation.

Discovery Quay Phase 1 and 2

The Optima FC included multi-depth panels to create a 3D effect along with secret fix assembled triangle segments to further emphasize the projection.

Testimonials

Jamie Brown, Business Development Manager at Sotech, commented:

“Discovery Quay Phase 2, is a continuation of the distinctive design from phase 1, with even more prominent colour combinations making the building stand out in Salford. Standardisation and repetition of the panel types made this job flow through the manufacture process with ease.”

Jason Cross, Operations Director at Britplas added:

“We are proud to have worked alongside Sotech on the delivery of Discovery Quay phase 2. During the delivery of phase 1, we worked closely with Sotech to develop a method to ‘secret fix’ the triangular panels onto standard panels at their fabrication facility, a technique we employed again in phase 2. Sotech’s expertise in delivering innovative façade systems has been crucial in bringing the vibrant vision of this building to life. Together, we’ve created a striking and unique façade that adds character to the Salford skyline.”

The expert team at Sotech worked closely with Britplas Facades and their team of specialists to design the original façade, developing a method to secret fix the triangular sections onto standard panels at our fabrication facility. This reduced the quantity of parts the installer would have to handle.

3D PANEL

Discovery Quay Phase 1 and 2

The phase 2 project, 15 storeys of colourful panels, bring a new vibrancy to the area, providing additional student accomodation in the popular area of Salford, Manchester.

To find out more about how the expert team at Sotech can assist in your next rainscreen cladding project, click here.

 

Project Details:

Location: Salford

Sector: Student Accommodation

Installer: Britplas Facades

Main Contractor Phase 1: Create Construction

Main Constractor Phase 2: Grahams Construction

Architect: KKA Architecture 

 

Close
Download List (0)

No downloads in list yet. No downloads in list yet.

Close
0