TITLE
SUBtitle
Feature |
Standard Rainscreen Testing |
CWCT Sequence B Testing |
|---|---|---|
| Water Management | Surface water control only | Wind-driven rain under pressure |
| Air Pressure Testing | Minimal pressure testing | Cyclical, increasing/decreasing pressure |
| Wind Load Simulation | Often limited or static | Cyclical, increasing/decreasing pressure |
| Structural Testing | Typically not included | Included: dynamic wind load testing |
| Certification | Often internal | Independently verified by UL Solutions |
| Best Use Case | Low-rise, low-exposure projects | High-rise, exposed, or mission-critical builds |