Technical +44 (0) 191 587 9213 | General Enquiries +44 (0) 191 587 2287

CWCT vs Standard Rainscreen Testing

CWCT vs Standard Rainscreen Testing 

AT A GLANCE

xxx

TESTING VIDEO

TITLE

SUBtitle

Feature

Standard Rainscreen Testing

CWCT Sequence B Testing

Water Management Surface water control only Wind-driven rain under pressure
Air Pressure Testing Minimal pressure testing Cyclical, increasing/decreasing pressure
Wind Load Simulation Often limited or static Cyclical, increasing/decreasing pressure
Structural Testing Typically not included Included: dynamic wind load testing
Certification Often internal Independently verified by UL Solutions
Best Use Case Low-rise, low-exposure projects High-rise, exposed, or mission-critical builds
LINK HERE
Close
Download List (0)

No downloads in list yet. No downloads in list yet.

Close
0